The “Airborne DC Charge” wind turbine astonishes the “BAUMA” fair
On 8th-14th, April 2019, ANE 2kW pitch controlled wind turbine is showed in BAUMA fair with the form of “Airborne DC Charge”, causing the sensational effect. Most of the visitors show a good comment and approval for this revolutionary system application.
The above fig shows the comment from one of visitor
For most of customers, they think the wind turbine should be installed on the ground normally, it is no possible to mount it on the big mine machine. But our partner Keestrack and our do not think so, we want to accept the challenge. After the several checking, calculation, and designing, we finally realize it. After the total system test run, we bring it to the BAUMA!
This system and application brings two revolution results. The first one is change the installation load from static plat to movement plat, this is also a reference for the offshore wind turbine system installation. The second one is the enlarge the application of mine machine, it reduces the oil consumption and improve the machine’s competition!
After the fair, our partner has start to follow up the pending customers for this system, and be ready to promote it in the market. We believe, the target of “Customer’s requirement is our responsibility” will lead us to develop much more revolution products and provide our energy for the wind turbine business!